Rate Schedule [Ansonia/Valley Area Customers Only]

Home | Consumer Information | Rate Schedule

This page is for  Ansonia/Valley Office (Former BUI) Customers Ansonia/Valley Office Area Towns (Former BUI Customers):
Ansonia, Derby, and Seymour.
New Haven Area Customers New Haven Office Area Towns: Bethany, Branford, Cheshire, East Haven, Hamden, Milford, New Haven, North Branford, North Haven, Orange, West Haven, Woodbridge. Link to Your Rate Schedule Here

Effective April 8, 2009

Quarterly Rates

Meter Size
Service Charges
Cost of Consumption Per 100 Cubic Feet
5/8"
$34.18
Residential—$3.710
Commercial—$3.204
Industrial—$2.934
Public Authority—$3.055
3/4"
51.27
1"
85.45
1-1/2"
170.90
2"
273.44
3"
512.70
4"
854.50
6"
1,709.00
8"
2,734.00
10"
3,930.70
Privately Owned
11.05

Monthly Rates

Meter Size
Service Charges
Cost of Consumption Per 100 Cubic Feet
5/8"
$11.39
Residential—$3.710
Commercial—$3.204
Industrial—$2.934
Public Authority—$3.055
3/4"
17.09
1"
28.48
1-1/2"
56.97
2"
91.15
3"
170.90
4"
284.83
6"
569.67
8"
911.47
10"
1,310.23
Privately Owned
11.05

Fire Service Charges

Private Fire Service Rates
Private Annual Quarterly
1" $16.10 $6.2267
2" 84.36 23.2939
3" 239.46 62.0682
4" 506.97 128.9455
6" 1,467.06 368.9671
8" 3,123.01 782.9555
10" 5,613.90 1,405.6794
12" 9,066.19 2,268.752
Public Fire Service Rates
Connection Quarterly Monthly
Per Inch Foot of Main $0.03576 $0.01192
Per Hydrant 60.00 20.00

Economic Development Rate

The Authority offers an “economic development rate” as an incentive to encourage new commercial or industrial customers in its service area, assessing the customer at 80 percent of applicable water rates for the first five years of occupancy. If the customer’s period of occupancy is less than five years, the Authority will pro-rate the full rate back to the first date of occupancy. After the initial five year period, the Authority will assess the customer its full applicable water rates.

To qualify for this economic development rate, the customer must:

Miscellaneous Rates

Reconnection Charge
    Prior to 3:30 p.m. (after termination of service)
$50.00
After Hours Reconnection
     Charge between 3:30 p.m. and 5:00 p.m.
     (after termination of service)
75.00
Collection Activity Charge (for service call due to delinquency)
18.00
Waste Inspection Charge
50.00
Meter Resetting Charge
35.00
Meter Removal Charge
35.00
Lien Processing Charge
16.00
Private Use of Public Hydrant:
    (water usage above the allowance will be charged at seasonal rates)
 
    Meter Service Charge
202.00
    Minimum Charge (12,000 gallon allowance)
72.00
    Seasonal Minimum Charge (60,000 gallon allowance)
274.00
Tank Truck Water (per 6,000 gallons)
50.00
Deficient Check
25.00
Wholesale (per cu.ft.)
2.033
Operate Curb Valve
 
    Turn on or off during work hours
25.00
    Turn on or off outside work hours
35.00
    Turn on or off during Sundays or holidays
50.00
Excavation for Termination:
 
    (1) at curb valve
306.00
    (2) in street at tap
(A)
Backflow Device Testing Charges:
 
    Scheduled Testing
54.00
    Unscheduled Testing
109.00
    Confined Space, Pit/Vault
109.00
    Pit/Vault Requiring Pumping
(A)
Meter Replacement Charges:
 
    5/8" & 3/4"
160.00
    1"
205.00
    1-1/2"
326.00
    2"
446.00
    Over 2"
(A)

(A) The charge will be the Authority’s cost of material, labor and equipment used, plus overhead at prevailing rates. In circumstances where this procedure for charging a customer would significantly delay the final billing, the Authority will use an appropriate estimate of its cost.

Service Connection Charges

Prior to the approval of an application, a service connection charge shall be paid by each applicant for each new service connection and meter installation as follows:

Corporation Stop or Branch Connection

Size
Charges
1"
$210.00
1-1/2"
220.00
2"
335.00
Over 2"
(A)

Meter Installation

Size
Charges
5/8"& 3/4"
$115.00
1"
115.00
1-1/2"
225.00
2"
225.00
Over 2"
(A)

(A) The charge will be the Authority’s cost of material, labor and equipment used, plus overhead at prevailing rates. In circumstances where this procedure for charging customers would significantly delay the final billing, the Authority will use an appropriate estimate of its cost.

Note: See rules of Authority, Re: Necessary inspection by Authority personnel of installation prior to backfilling and paving. The purpose of these charges is to defray the cost of installing the corporation stop or branch connection for a service connection, installing the meter (does not include the cost of the meter) and inspecting the service connection installation.

Local Facilities Charge

The purpose of the local facilities charges is to collect a fair contribution from the applicant toward the cost of the utility system, heretofore paid by existing customers.

A local facilities charge for each separate connection to a water main shall be paid by each applicant who desires to secure water service from the main. The applicant will pay the charge prior to the Authority’s granting approval for a service connection.

Meter Size
Facilities Charges
5/8" & 3/4"
$440.00
1"
660.00
1- 1/2"
770.00
2"
1,210.00
3"
4,850.00
4"
6,060.00
6"
9,150.00
8"
12,660.00

Charges for Pipe Installation*

Charges for pipe installation under rules and regulations of main will be the cost of the pipe, labor and equipment used, plus overheads at prevailing rates. In those circumstances where this procedure will cause a significant delay in the final billing, the Authority will use an appropriate substitute for cost. If pavement, excavation and repairs are required for the extension, these additional charges will be added to the final invoice. The cost of pipe will normally be based on 8" main but, if for any reason it is necessary to install pipe larger or smaller than 8" to satisfy the requirements of the applicant, cost shall be based on the pipe size actually required.

*Subject to proportionate sharing

Miscellaneous Charges

Charges for all services or materials are based on the direct cost of the material, labor and equipment used, plus overhead at prevailing rates. In those circumstances where the procedure will cause a significant delay in the final billing, the Authority will use an appropriate substitute for cost. These charges are assessed on the water bill account whenever possible, otherwise a separate invoice is rendered.

How to Compute Your Bill

Using the quarterly* meter rates and the assumed readings used below, the total bill would be computed as follows:

Present Reading
418 (100 Cu. Ft.)
Reading Last Quarter
393 (100 Cu. Ft.)
Water Used Present Quarter
25 (100 Cu. Ft.)
Customer Bill Calculation:
 
Service Charge (1)
$34.18
Rate (2,500 cu. ft. x $3.710 per 100 cu. ft.)
92.75
TOTAL BILL
$126.93

*Quarters may contain more or less than 91 days.
(1) Service charge based on 5/8” meter.