| Meter Size | Service Charges |
Cost of Consumption Per 100 Cubic Feet |
|---|---|---|
| 5/8" & 3/4" | $33.77 |
For All Meter Sizes First 1,000,000 Cu. Ft. $2.537 Over 1,000,000 Cu. Ft. $1.931 |
| 1" | 51.00 |
|
| 1- 1/2" | 85.06 |
|
| 2" | 114.97 |
|
| 3" | 154.77 |
|
| 4" | 228.94 |
|
| 6" | 394.55 |
|
| 8" | 682.80 |
|
| 10" | 975.59 |
|
| Privately Owned | 11.05 |
| Meter Size | Service Charges |
Cost of Consumption Per 100 Cubic Feet |
|---|---|---|
| 5/8" & 3/4" | $18.62 |
For All Meter Sizes First 333,333 Cu. Ft. $2.537 Over 333,333 Cu. Ft. $1.931 |
| 1" | 24.35 |
|
| 1- 1/2" | 35.72 |
|
| 2" | 45.65 |
|
| 3" | 58.95 |
|
| 4" | 83.69 |
|
| 6" | 138.90 |
|
| 8" | 234.98 |
|
| 10" | 332.47 |
|
| Privately Owned | 11.05 |
(Summer Season is from April 1 - November 1)
| Meter Size | Service Charges |
Cost of Consumption Per 100 Cubic Feet |
|---|---|---|
| 5/8" & 3/4" | $155.46 |
For All Meter Sizes All Consumption $3.155 |
| 1" | 224.31 |
|
| 1- 1/2" | 360.68 |
|
| 2" | 480.96 |
|
| 3" | 639.40 |
|
| 4" | 936.20 |
| Private Fire Service | Annual Charges |
|---|---|
| Under 4” Diameter Connection | $82.31 |
| 4” Diameter Connection | 173.29 |
| 6” Diameter Connection | 433.22 |
| 8” Diameter Connection | 779.80 |
| 10” Diameter Connection | 779.80 |
| 12” Diameter Connection | 779.80 |
| Public Fire Service | Annual Charges |
|---|---|
| Per inch-foot of main | $0.04823 |
| Per hydrant | 99.20 |
The Authority offers an “economic development rate” as an incentive to encourage new commercial or industrial customers in its service area, assessing the customer at 80 percent of applicable water rates for the first five (5) years of occupancy. If the customer’s period of occupancy is less than five (5) years, the Authority will pro-rate the full rate back to the first date of occupancy. After the initial five (5) year period, the Authority will assess the customer its full applicable water rates.
To qualify for this economic development rate, the customer must:
| Reconnection Charge Prior to 3:30 p.m. (after termination of service) |
$38.00 |
| After Hours Reconnection Charge between 3:30 p.m. and 5:00 p.m. (after termination of service) |
75.00 |
| Collection Activity Charge (for service call due to delinquency) | 18.00 |
| Waste Inspection Charge | 50.00 |
| Meter Resetting Charge | 115.00 |
| Lien Processing Charge | 16.00 |
| Private Use of Public Hydrant: (water usage above the allowance will be charged at seasonal rates) |
|
| Meter Service Charge | 202.00 |
| Minimum Charge (12,000 gallon allowance) | 72.00 |
| Seasonal Minimum Charge (60,000 gallon allowance) | 274.00 |
| Tank Truck Water (per 6,000 gallons) | 46.00 |
| Deficient Check | 15.00 |
| Wholesale (per million gallons) | 1,755.00 |
| Operate Curb Valve | 135.00 |
| Excavation for Termination: | |
| (1) at curb valve | 306.00 |
| (2) in street at tap | (A) |
| Backflow Device Testing Charges: | |
| Scheduled Testing | 54.00 |
| Unscheduled Testing | 109.00 |
| Confined Space, Pit/Vault | 109.00 |
| Pit/Vault Requiring Pumping | (A) |
| Meter Replacement Charges: | |
| 5/8" & 3/4" | 160.00 |
| 1" | 205.00 |
| 1-1/2" | 326.00 |
| 2" | 446.00 |
| Over 2" | (A) |
(A) The charge will be the Authority’s cost of material, labor and equipment used, plus its cost of overhead at prevailing rates. In circumstances where this procedure for charging a customer would significantly delay the final billing, the Authority will use an appropriate substitute for its cost.
Prior to the approval of an application, a service connection charge shall be paid by each applicant for each new service connection and meter installation as follows:
| Size | Charges |
|---|---|
| 1" | $210.00 |
| 1-1/2" | 220.00 |
| 2" | 335.00 |
| Over 2" | (A) |
| Size | Charges |
|---|---|
| 5/8"& 3/4" | $115.00 |
| 1" | 115.00 |
| 1-1/2" | 225.00 |
| 2" | 225.00 |
| Over 2" | (A) |
(A) The charge will be the Authority’s cost of material, labor and equipment used, plus its cost of overhead at prevailing rates. In circumstances where this procedure for charging customers would significantly delay the final billing, the Authority will use an appropriate substitute for its cost.
Note: See rules of Authority, Re: Necessary inspection by Authority personnel of installation prior to backfilling and paving. The purpose of these charges is to defray the cost of installing the corporation stop or branch connection for a service connection, installing the meter (does not include the cost of the meter) and inspecting the service connection installation.
The purpose of the local facilities charges is to collect a fair contribution from the applicant toward the cost of the utility system, heretofore paid by existing customers.
A local facilities charge for each separate connection to a water main shall be paid by each applicant who desires to secure water service from the main. The applicant will pay the charge prior to the Authority’s granting approval for a service connection.
| Meter Size | Facilities Charges |
|---|---|
| 5/8" & 3/4" | $440.00 |
| 1" | 660.00 |
| 1- 1/2" | 770.00 |
| 2" | 1,210.00 |
| 3" | 4,850.00 |
| 4" | 6,060.00 |
| 6" | 9,150.00 |
| 8" | 12,660.00 |
Charges for pipe installation under Extension of Main Rules and Regulations will be the actual cost of the pipe, labor and equipment used, plus overheads at prevailing rates. In those circumstances where this procedure will cause a significant delay in the final billing, the Authority will use an appropriate substitute for actual cost. If pavement, excavation and repairs are required for the extension, these additional charges will be added to the final invoice. The cost of pipe will normally be based on 8” main but, if for any reason it is necessary to install pipe larger or smaller than 8” to satisfy the requirements of the applicant, cost shall be based on the pipe size actually required.
*Subject to proportionate sharing
Charges for all services or materials are based on the actual, direct cost of the material, labor and equipment used, plus the cost of overhead at prevailing rates. In those circumstances where the procedure will cause a significant delay in the final billing, the Authority will use an appropriate substitute for actual cost. These charges are assessed on the water bill account whenever possible, otherwise a separate invoice is rendered.
Using the quarterly* meter rates and the assumed readings used below, the total bill would be computed as follows:
| Present Reading | 418 (100 Cu. Ft.) |
| Reading Last Quarter | 393 (100 Cu. Ft.) |
| Water Used Present Quarter | 25 (100 Cu. Ft.) |
| Customer Bill Calculation: | |
| Service Charge (1) | $33.77 |
| Rate for the first 1,000,000 cu. ft. (2,500 cu. ft. x $2.537 per 100 cu. ft.) | 63.43 |
| TOTAL BILL | $97.20 |
*Quarters may contain more or less than 91 days.
(1) Service charge based on 5/8" meter.