| Meter Size | Service Charges |
Cost of Consumption Per 100 Cubic Feet |
|---|---|---|
| 5/8" & 3/4" | $32.19 |
For All Meter Sizes First 1,000,000 Cu. Ft. $2.418 Over 1,000,000 Cu. Ft. $1.841 |
| 1" | 48.61 |
|
| 1- 1/2" | 81.08 |
|
| 2" | 109.59 |
|
| 3" | 147.53 |
|
| 4" | 218.23 |
|
| 6" | 376.09 |
|
| 8" | 650.85 |
|
| 10" | 929.94 |
|
| Privately Owned | 10.53 |
| Meter Size | Service Charges |
Cost of Consumption Per 100 Cubic Feet |
|---|---|---|
| 5/8" & 3/4" | $17.75 |
For All Meter Sizes First 333,333 Cu. Ft. $2.418 Over 333,333 Cu. Ft. $1.841 |
| 1" | 23.21 |
|
| 1- 1/2" | 34.05 |
|
| 2" | 43.51 |
|
| 3" | 56.19 |
|
| 4" | 79.77 |
|
| 6" | 132.40 |
|
| 8" | 223.98 |
|
| 10" | 316.91 |
|
| Privately Owned | 10.53 |
(Summer Season is from April 1 - November 1)
| Meter Size | Service Charges |
Cost of Consumption Per 100 Cubic Feet |
|---|---|---|
| 5/8" & 3/4" | $148.19 |
For All Meter Sizes All Consumption $3.007 |
| 1" | 213.81 |
|
| 1- 1/2" | 343.80 |
|
| 2" | 458.45 |
|
| 3" | 609.48 |
|
| 4" | 892.39 |
| Private Fire Service | Annual Charges |
|---|---|
| Under 4” Diameter Connection | $78.46 |
| 4” Diameter Connection | 165.18 |
| 6” Diameter Connection | 412.95 |
| 8” Diameter Connection | 743.31 |
| 10” Diameter Connection | 743.31 |
| 12” Diameter Connection | 743.31 |
| Public Fire Service | Annual Charges |
|---|---|
| Per inch-foot of main | $0.04597 |
| Per hydrant | 94.56 |
An economic development rate is designed as an incentive to encourage new commercial or industrial customers in the Authority’s service area. The economic development rate will be assessed at 80% of the applicable water rates for the first five (5) years of occupancy. If the occupancy period is less than five (5) years, the full rate will be prorated back to the first day of occupancy. After the initial five (5) year period, the full applicable water rates will be assessed.
The parameters to qualify for this economic development rate are as follows:
| Reconnection Charge Prior to 3:30 p.m. (after termination of service) |
$38.00 |
| After Hours Reconnection Charge between 3:30 p.m. and 5:00 p.m. (after termination of service) |
75.00 |
| Collection Activity Charge (for service call due to delinquency) | 18.00 |
| Waste Inspection Charge | 50.00 |
| Meter Resetting Charge | 100.00 |
| Lien Processing Charge | 16.00 |
| Private Use of Public Hydrant: (water usage above the allowance will be charged at seasonal rates) |
|
| Meter Service Charge | 198.00 |
| Minimum Charge (12,000 gallon allowance) | 67.00 |
| Seasonal Minimum Charge (60,000 gallon allowance) | 250.00 |
| Tank Truck Water (per 6,000 gallons) | 44.00 |
| Deficient Check | 15.00 |
| Wholesale (per million gallons) | 1,718.00 |
| Operate Curb Valve | 125.00 |
| Excavation for Termination: | |
| (1) at curb valve | 306.00 |
| (2) in street at tap | (A) |
| Backflow Device Testing Charges: | |
| Scheduled Testing | 50.00 |
| Unscheduled Testing | 100.00 |
| Confined Space, Pit/Vault | 100.00 |
| Pit/Vault Requiring Pumping | (A) |
| Meter Replacement Charges: | |
| 5/8" & 3/4" | 152.00 |
| 1" | 202.00 |
| 1-1/2" | 326.00 |
| 2" | 446.00 |
| Over 2" | (A) |
(A) The charge will be the cost of material, labor and equipment used, plus the cost of overhead at prevailing rates. In circumstances where this procedure could cause a significant delay in the final billing, the Authority will use an appropriate estimate of cost.
Prior to the approval of an application, a Service Connection Charge shall be paid by each applicant for each new service connection and meter installation as follows:
| Size | Charges |
|---|---|
| 1" | $190.00 |
| 1-1/2" | 200.00 |
| 2" | 270.00 |
| Over 2" | (A) |
| Size | Charges |
|---|---|
| 5/8"& 3/4" | $100.00 |
| 1" | 100.00 |
| 1-1/2" | 210.00 |
| 2" | 210.00 |
| Over 2" | (A) |
(A) The charge will be the cost of material, labor and equipment used, plus the cost of overhead at prevailing rates. In circumstances where this procedure could cause a significant delay in the final billing, the Authority will use an appropriate estimate of cost.
Note: See rules of Authority, Re: Necessary inspection by Authority personnel of installation prior to backfilling and paving. The purpose of these charges is to defray the cost of installing the corporation stop or branch connection for a service connection, installing the meter (does not include the cost of the meter) and inspecting the service connection installation.
A Local Facilities Charge for each separate connection to a water main shall be paid by each applicant who desires to secure water service therefrom, which charge shall be paid prior to the approval of the application for a service connection.
| Meter Size | Facilities Charges |
|---|---|
| 5/8" & 3/4" | $440.00 |
| 1" | 660.00 |
| 1- 1/2" | 770.00 |
| 2" | 1,210.00 |
| 3" | 4,850.00 |
| 4" | 6,060.00 |
| 6" | 9,150.00 |
| 8" | 12,660.00 |
The purpose of these charges is to collect a fair contribution from the applicant toward the cost of the utility system heretofore paid by existing customers.
Charges for pipe installation under Extension of Main Rules and Regulations will be the actual cost of the material, labor and equipment used, plus overhead at prevailing rates. In those circumstances where this procedure could cause a significant delay in the final billing, the Authority will use an appropriate substitute for actual cost. If pavement, excavation and repairs are required for the extension, these additional charges will be added to the final invoice. The cost of pipe will normally be based on 8-inch main, but if for any reason it is necessary to install pipe larger or smaller than 8-inch to satisfy the requirements of the applicant, cost shall be based on the pipe size actually required.
*Subject to proportionate sharing
Charges for all services or material sales are based on the actual, direct cost of the material, labor and equipment used, plus overhead at prevailing rates. In those circumstances where the procedure could cause a significant delay in the final billing, the Authority will use an appropriate substitute for actual cost. These charges are assessed on the water bill account whenever possible, otherwise a separate invoice is rendered.
Using the quarterly* meter rates and the assumed readings used below, the total bill would be computed as follows:
| Present Reading | 418 (100 Cu. Ft.) |
| Reading Last Quarter | 393 (100 Cu. Ft.) |
| Water Used Present Quarter | 25 (100 Cu. Ft.) |
| Customer Bill Calculation: | |
| Service Charge (1) | $32.19 |
| Rate for the first 1,000,000 cu. ft. (2,500 cu. ft. x $2.418 per 100 cu. ft.) | 60.45 |
| TOTAL BILL | $92.64 |
*Quarters may contain more or less than 91 days.
(1) Service charge based on 5/8" meter.